| RTD News |
 |
| |
RTD Construction recently received a $32.7 million dollar prime contract from the City of Villa Rica, GA for the construction of the City’s New West Water Reclamation Facility. This project involves the construction of a complete New Water Reclamation Facility to replace the City’s outdated existing West Wastewater Treatment Plant.
The new facility consists of an Influent Pump Station and Head Works, a Biological Treatment Unit, Two Secondary Clarifiers, a Tertiary Treatment Unit, an Ultraviolet Disinfection Unit, an Effluent Pump Station, a Cascade Aeration Structure, a Sludge Pumping Station, a Sludge Digestion Basin, a Plant Drain Pump Station, a Liquid Lime Storage and Feed System. Also included in this project are a Chemical/Electrical Building, a Maintenance Building, a Sludge Dewatering Building and a Control Building with offices, meeting rooms, locker rooms, plant Control rooms and laboratory facilities.
In addition to building these treatment structures and buildings, RTD will install all above and below ground process piping and all mechanical process equipment with its’ own forces. When this project is completed, RTD ‘Constructors’ will have formed and placed 14,000 CY of concrete, installed 10,000 LF of various size and types of process piping and excavated and compacted more than 100,000 CY of soil.
This project has an Estimated Completion Date of March 2011.
The City Manager of Villa Rica, Larry Wood was recently quoted in the local newspaper as saying “Now that we’re into it, I’m comfortable with RTD handling the project. The project manager out there is a real hands-on guy and I’ve been pleased with their progress. They don’t give excuses: they get results and that’s what you’ve got to have on a project like this.”
|
|
| |
|
|
| |
The following is
a Partial listing of Recently Completed Projects:
|
|
| |
|
|
| |
Peace River Facility Expansion Contract Two- WTP Expansion
Subcontractor
Contract Amount: $
11,507,213.00
|
Owner:
|
Engineer:
|
|
Peace River/Manasota Regional Water Supply Authority
|
Boyle Engineering
|
|
6311 Atrium Dr., Suite 100
|
5971 Cattleridge Blvd.
|
|
Bradenton, FL. 34202
|
Sarasota, FL. 34232
|
|
|
|
|
Scope: |
Our portion of this project consisted of construction of a new filter building and transfer pump station, refurbishment of the existing river pump station, new chemical building and chemical feed systems, site work including all site piping, excavation, dewatering, reinforced concrete for new structures and the installation of all mechanical process equipment.
|
|
Status: |
Projected Completion Dec. 2009
|
|
Label
|
| - |
|
Central County Water Reclamation Facility Expansion Phase Two
Prime Contractor
Contract Amount: $
11,904,795.00
|
Owner:
|
Engineer:
|
|
Sarasota County BOCC
|
MWH
Americas, Inc.
|
|
1660 Ringling Blvd.
|
7591 Palmer Blvd.
|
|
Sarasota, FL. 34236
|
Sarasota, FL. 34240
|
|
|
|
|
Scope: |
Construction of the Central County WRF Expansion Phase Two included modifications to
the existing main lift station including a 12MGD bypass system, conversion of
oxidation ditches into new Aeration Basins with diffused aeration systems, new
chlorine contact tanks, new Anoxic Tanks, a new Main Electrical Building, a new
Aeration Blower Building, all site work, yard piping and restoration
|
|
Status: |
Projected Completion Dec. 22nd,
2008
|
|
Label
|
| - |
| |
Plant City Water Reclamation Facility Expansion & Improvements
Subcontractor
Contract Amount: $
11,427,672.00
|
Owner:
|
Engineer:
|
|
City of Plant City
|
Malcolm-Pirnie
|
|
302 W. Reynolds Street
|
1330 E. 18th Avenue
|
|
Plant City, Fl. 33564
|
Tampa, Fl. 33605
|
|
|
|
|
Scope: |
As Subcontractor, we were responsible for all work necessary to complete the civil
construction of the Anoxic basins, three new clarifiers, a filter addition,
additions to the chlorine contact chamber, RAS/WAS pump structure, Generator and
Fuel Storage Tank concrete slabs, above
and below ground process piping installation and the installation of all
mechanical process equipment. We were also responsible for all demolition
required to complete our construction work and mechanical process equipment
installations. |
|
Status: |
Projected Completion Dec. 2007
|
|
Label
|
- |
| |
Horseshoe Beach Water Treatment Plant & Well Improvements, Horseshoe Beach, FL.
Prime Contractor
Contract Amount: $
4,360,540.00
|
Owner:
|
Engineer:
|
|
Town of Horseshoe Beach, FL.
|
Darabi & Associates, Inc.
|
|
P.O. Box 86
|
730 NE Waldo Rd. Suite A
|
|
Horseshoe Beach, Fl. 32648
|
Gainesville, FL. 32641
|
|
|
|
|
Scope: |
Our work on this project consisted of raw water supply well improvements including
well pumps and piping, all site work, construction of a process building to
house offices, restrooms, laboratory and all of the Reverse Osmosis water
treatment equipment, all above and below ground process piping, construction of
a high service pump station, installation of approximately 10,000 feet of City
water main and Reject water main, and all electrical and control systems. |
|
Status: |
Projected Completion
April 2009
|
|
Label
|
| - |
| |
Fruitville Wastewater Treatment Plant Expansion to 2.4 MGD-Sarasota, FL
Prime Contractor
Contract Amount: $
4,737,045.00
|
Owner:
|
Engineer:
|
|
Aqua Utilities Florida, Inc.
|
DMK Associates
|
|
6960 Professional Pkwy. East
|
4315 S. Access Rd.
|
|
Sarasota, FL 34240
|
Englewood, FL 34224
|
|
|
|
|
Scope: |
This project was for the Additions & Renovations to an existing Wastewater Treatment Plant. Our work included the construction of four (4) Denitrification Filters, a new chlorine contact tank, a new aeration tank, a new clarifier, two new digesters, a new lined reject water pond, a new blower facility & multiple pump stations, all above and below ground process piping, installation of all mechanical process equipment and a new electrical building. |
|
Status: |
Projected Completion March 2006
|
|
Label
|
| - |
| |
Wastewater Treatment Plant Expansion – Englewood, FL
Prime Contractor
Contract Amount: $
3,946,629.34
|
Owner:
|
Engineer:
|
|
Englewood Water District
|
CH2M Hill
|
|
201 Selma Ave.
|
3100 SW Williston Rd.
|
|
Englewood, FL 34295
|
Gainesville, FL 32608
|
|
|
|
|
Scope: |
This project was for the Additions and Renovations to an existing Wastewater Treatment Plant including a new sludge dewatering building, a new plant control building. a static screen structure, a plant drain pump station utilizing a caisson / tremied concrete method, a new effluent pump station, a new disk filter, a 4 acre drainage pond, a digested sludge pump station, new sludge return pumps and all above and below ground process piping and mechanical process equipment installation. |
|
Status: |
Projected Completion July 2005
|
|
Label
|
| - |
| |
Sunflower Trail Master Pump Station Project – Orlando, FL
Prime Contractor
Contract Amount: $2,083,000.00
|
Owner:
|
Engineer:
|
|
Orange County BOCC
|
CPH Engineering
|
|
400 E. South St., 2nd Floor
|
1117 E. Robinson St.
|
|
Orlando, FL 32801
|
Orlando, FL
|
|
|
|
|
Scope: |
This project was a new cast in place concrete master pumping station. Our work included installation of sheet piling, all formed and poured concrete wok, a new gravity sewer and manholes, a Motor Control Center Building, a new emergency generator and fuel system, an odor control system, all site work, all above and below grade process piping, installation of all mechanical process equipment and a masonry perimeter wall & fencing. |
|
Status: |
Projected Completed October 2005
|
|
Sunflower PS
|
| - |
| |
SRF Wastewater Transmission Main Extension - Groveland, FL
Prime Contractor
Contract Amount: $
1,308,908.00
|
Owner:
|
Engineer:
|
|
City of Groveland
|
|
|
156 South Lake Ave.
|
Mittauer & Associates
|
|
Groveland, FL 34736
|
Orange Park, FL
|
|
|
|
|
Scope: |
This project included 3,500 LF of 12” PVC Water main, 18,000 LF of 12” PVC/HDPE Force main, all restoration of disturbed areas and a New lift station. Both Directional Drilling and the Jack & Bore method were employed to complete this project. |
|
Status: |
Project completed October 2004
|
|
|
| - |
| |
Biosolids Treatment Implementation Digester Refurbishment - Clearwater, FL
Prime ContraPrime Contractor
Contract Amount: $
5,016,130.00
|
Owner:/span>
|
Engineer:
|
|
City of Clearwater
|
Parsons
|
|
P.O. Box 4748
|
3450 Buschwood Park Dr.
Suite 345
|
|
Clearwater, FL 33758-4748
|
Tampa, FL 33618
|
|
|
|
|
Scope: |
We completed Additions and Renovations to existing Wastewater Treatment Plants at two Sites. Our contract included construction of new sludge boiler rooms, new mixing pump buildings, and the complete refurbishment of two 90’ diameter floating steel digester covers. In addition to this we furnished and installed new sludge digester gas equipment, new sludge recirculation pumps with grinders, new boilers complete with hot water circulation systems and all other above and below ground process piping. |
|
Status: |
Projected Completion April 2006
|
|
Label
|
| - |
| |
Arbennie Pritchett Water Reclamation Facility - Mechanical & Civil Project
Subcontractor
Contract Amount: $
4,843,250.00
|
Owner:
|
Engineer:
|
|
Okaloosa County BOCC
|
CDM Constructors, Inc.
|
|
302 N. Wilson St.
|
2301 Maitland Center Pkwy Suite 300
|
|
Crestview, Fl. 32536
|
Maitland, Fl. 32751
|
|
|
|
|
Scope: |
Our portion of this project was for the complete construction of all cast in place
concrete structures, foundations and walkways for this entire project. The new
structures included a headwork’s facility, a RAS/WAS sludge pump station with a
flow splitter structure, a UV disinfection structure with an integral effluent
pump station, a new sludge centrifuge structure and loading facility,
installation of two new generators, a complete blower facility, a septage
receiving system, a Bio-filter odor control system, all above and below ground
process piping, new chemical feed systems and all associated chemical feed
piping, and the installation of all owner purchased mechanical process equipment
including sluice and slide gates, two mechanical bar screens, two grit
classifiers, two vortex grit removal systems, grit removal pumps, vertical
turbine effluent and horizontal split case sludge pumps, two 100 foot
clarifiers, five blowers and associated controls, a rotary drum thickener, a
sludge centrifuge, Ultra-violet disinfection equipment and controls,
generators, rotary drum thickener, eight
mixers, six aerators and all air diffusion systems. |
|
Status: |
Projected Completion July 2009
|
|
|
| - |
| |